Paints
Pay in 3 interest-free payments on purchases from £30-2000 with
. Learn more.
Loading...
End of content
Error - No more pages to load
About Paints
Selecting the right paint for professional trade applications and DIY projects requires careful consideration of substrate, environment, and finish requirements. From heavy-duty industrial floor coatings to specialist metal primers and decorative top coats, the range available at Tooled-Up.com covers every application from workshop refurbishment to structural steelwork protection. Modern paint formulations deliver exceptional durability, coverage, and resistance to chemicals, weathering, and mechanical wear.
Professional paints differ significantly from standard household decorating products, offering enhanced performance characteristics essential for commercial and industrial environments. Alkythane formulations provide outstanding hardness and chemical resistance for demanding applications, whilst specialist anti-slip floor paints ensure safety compliance on factory floors, loading bays, and pedestrian walkways. Primer systems create the crucial foundation for long-lasting paint systems, ensuring proper adhesion and corrosion protection on prepared substrates including steel, galvanised metal, and concrete.
Top coat finishes are available in gloss, satin, and matt formulations, each suited to different aesthetic and functional requirements. Hammertone finishes provide attractive textured coatings that disguise surface imperfections on metalwork, whilst smooth finishes deliver professional appearance on machinery, railings, and architectural steelwork. Specialist paints address unique challenges such as high-temperature applications, anti-condensation requirements, and hygienic food-safe environments.
Jargon Buster
- Alkythane: A high-performance paint combining alkyd resins with urethane technology, delivering exceptional durability, chemical resistance, and gloss retention. Ideal for industrial equipment, machinery, and surfaces subject to frequent cleaning or chemical exposure.
- Two-Pack (2K) Paint: A coating system requiring a separate hardener or catalyst to be mixed with the base paint before application. Once mixed, pot life is limited but the cured finish offers superior performance compared to single-pack alternatives, with enhanced chemical and abrasion resistance.
- DFT (Dry Film Thickness): The thickness of a paint coating after solvents have evaporated, typically measured in microns. Achieving specified DFT is critical for ensuring adequate protection and meeting performance standards for corrosion resistance and durability.
- Pot Life: The working time available after mixing two-pack paints before the material becomes too viscous to apply properly. Temperature affects pot life significantly – higher temperatures reduce working time whilst cooler conditions extend it.
- VOC (Volatile Organic Compounds): Solvents that evaporate during paint application and curing. UK and EU regulations limit VOC content in many paint categories to reduce environmental impact and workplace exposure. Low-VOC formulations are increasingly specified for indoor applications.
- Overcoating Time: The minimum and maximum time windows within which subsequent coats can be applied. Applying too soon risks lifting the previous coat, whilst exceeding maximum overcoating time may require surface preparation to ensure proper adhesion between layers.
Who Uses Paints?
Professional paints at Tooled-Up serve diverse trades and industries requiring durable, high-performance coatings:
- Maintenance Engineers: Factory and facility maintenance teams protecting machinery, equipment, and structural steelwork from corrosion and wear
- Fabricators and Welders: Metal fabrication workshops finishing manufactured components, gates, railings, and structural assemblies
- Painters and Decorators: Professional contractors requiring trade-quality paints for commercial and industrial projects
- Property Maintenance Companies: Teams maintaining commercial premises, warehouses, and industrial facilities
- Agricultural Contractors: Farm maintenance requiring weather-resistant coatings for buildings, equipment, and machinery
- Transport and Fleet Operators: Vehicle workshops, haulage companies, and plant hire businesses maintaining equipment appearance and protection
- Local Authorities: Council maintenance teams protecting street furniture, railings, gates, and public infrastructure
- Facilities Managers: Responsible for maintaining industrial units, warehouses, and commercial premises to professional standards
How to Choose the Right Paints
Selecting appropriate paint systems requires careful assessment of several critical factors:
Substrate Material: Different materials require specific primer systems. Ferrous metals need corrosion-inhibiting primers, galvanised surfaces require specialised adhesion primers, whilst concrete floors need alkali-resistant formulations. Always match the paint system to the substrate for optimal adhesion and longevity.
Environmental Conditions: Consider exposure to weather, chemicals, temperature extremes, and mechanical wear. External applications require UV-resistant formulations with excellent weathering properties, whilst chemical storage areas need coatings resistant to specific substances. Floor paints must withstand anticipated traffic – pedestrian, forklift, or heavy goods vehicles.
Finish Requirements: Gloss finishes provide easy-clean surfaces ideal for machinery and equipment, whilst matt finishes reduce glare in workshops. Satin offers a compromise between appearance and practicality. Hammertone textures disguise surface imperfections on older metalwork whilst providing attractive, durable finishes.
Performance Standards: Many applications require coatings meeting specific British or European standards for fire resistance, slip resistance, food safety, or corrosion protection. Verify that selected products meet relevant specifications for your application.
Application Method: Consider whether you'll apply by brush, roller, or spray equipment. Some formulations are optimised for specific application methods. Two-pack systems require accurate mixing and have limited pot life, whilst single-pack alternatives offer simpler application but may not achieve the same performance levels.
Coverage and System Build: Calculate paint requirements based on surface area and specified dry film thickness. Professional systems typically require primer, undercoat, and one or two top coats. Factor in surface condition – rough or porous substrates consume more paint than smooth, well-prepared surfaces.
Popular Accessories
Successful paint application requires complementary products and equipment:
- Paint Thinners and Reducers: Appropriate solvents for adjusting viscosity and cleaning equipment
- Surface Preparation Products: Degreasers, etching primers, and rust converters ensuring proper substrate preparation
- Application Equipment: Professional brushes, rollers, and spray equipment suited to coating type and scale
- Mixing Equipment: Paddle mixers and containers for thorough blending of two-pack systems
- Measuring Tools: Wet film thickness gauges and mixing ratios scales for accurate system application
- Masking Materials: Quality tape, paper, and sheeting protecting adjacent surfaces during application
- Personal Protective Equipment: Respirators, gloves, and protective clothing suitable for solvent-based coatings
- Storage Solutions: Paint mixing cups, sealed containers, and storage cabinets for maintaining material quality
Safety Information
Professional paints contain substances requiring proper handling and workplace controls:
COSHH Compliance: Review Safety Data Sheets before use and implement appropriate control measures. Many industrial paints contain solvents requiring adequate ventilation, respiratory protection, and skin protection. Two-pack systems often contain isocyanates requiring specialist respiratory equipment and training.
Ventilation Requirements: Ensure adequate fresh air supply when applying solvent-based paints indoors. Mechanical ventilation may be necessary in confined spaces. Monitor exposure levels where required by COSHH assessments.
Personal Protective Equipment: Wear appropriate respirators (filtered for organic vapours or supplied-air for isocyanates), chemical-resistant gloves, and protective clothing. Eye protection is essential when spraying or working overhead.
Fire Precautions: Many paints and thinners are highly flammable. Store away from ignition sources, maintain fire extinguishers nearby, and ensure hot work permits are in place when welding or cutting near painted surfaces. Solvent-soaked rags can spontaneously ignite – dispose of properly in sealed metal containers.
Waste Disposal: Dispose of paint waste, contaminated materials, and empty containers according to local authority hazardous waste procedures. Never pour solvents or paint residues down drains.
Frequently Asked Questions
What's the difference between single-pack and two-pack paints?
Single-pack paints cure through solvent evaporation and are ready to use straight from the tin, offering convenience and longer working time. Two-pack systems require mixing base paint with a separate hardener, triggering a chemical curing reaction that delivers superior durability, chemical resistance, and mechanical properties. Two-pack coatings are specified for demanding industrial applications but have limited pot life once mixed and require more careful handling.
Can I apply floor paint over existing coatings?
This depends on the condition and type of existing paint. Sound, well-adhered coatings can often be overcoated after thorough cleaning and light abrasion to provide a key. However, flaking, peeling, or incompatible existing paints must be completely removed. Oil or grease contamination prevents adhesion – degrease thoroughly before application. When in doubt, test a small area or remove existing coatings back to bare substrate for optimal results.
How long before painted floors can return to service?
Drying times vary significantly between products and conditions. Light foot traffic may be possible within 8-16 hours for many floor paints, but full mechanical properties develop over 5-7 days. Heavy traffic, chemical exposure, and vehicle use should wait until full cure is achieved – typically 7 days for single-pack systems and 5-7 days for two-pack formulations. Temperature affects curing significantly; cold conditions substantially extend drying and curing times.
What preparation is needed for metal surfaces?
Proper surface preparation is critical for paint system performance. Remove all rust, mill scale, and previous loose coatings by wire brushing, grinding, or abrasive blasting. Degrease to remove oil, grease, and contaminants using appropriate solvents. Apply suitable primer (zinc phosphate for ferrous metals, etch primer for galvanised or aluminium) within the timeframe specified to prevent flash rusting. Better preparation delivers dramatically longer-lasting results.
Are low-VOC paints suitable for industrial applications?
Modern low-VOC formulations increasingly match traditional solvent-based paints for performance whilst reducing environmental impact and workplace exposure. Water-based industrial paints now offer excellent durability for many applications, though solvent-based or two-pack systems still outperform for extreme chemical exposure, immersion service, or maximum durability requirements. Consider environmental conditions, performance requirements, and application constraints when selecting between low-VOC and traditional formulations.
